Monday, September 2, 2019

Final preparations for landfall

Today's stand-up meeting at HQ was focused on the next 72 hours.  Both the hotel I am staying at, and Convention Center HQ is located at; are hurricane 5 rated structures.  Leadership is confident everyone will be safe for the storm.

It also looks like Dorian is developing a concentric eye-wall (one inside another).  The up-side is that Dorian is likely to weaken dramatically.  The down-side is that Dorian is likely to expand, affecting more people.

Today's goals will be to finalize the pre-landfall set-up, and standby for the official "ground stop".  Once leadership places zone as "ground stop", all projects are put on-hold, and everyone moves to their shelter-in-place spots to wait out the storm.

No comments: